027 654 0306

Our Work
Slipform Projects.
RECENT PROJECT
Custom Concrete Road and V Drain
We are excited to share the completion of a project featuring three concrete roads in the Auckland Region. The highlighted image showcases the first of these roads, spanning 420 linear meters and consuming 200 cubic meters of concrete within just 2 days. Our team's innovative approach included crafting a custom-built mould, designed with a V drain system along the road's edge, all while ensuring precise height maintenance for proper water runoff.


RECENT PROJECT
Custom Dish
Drain
Slipform NZ completed this significant project on the Brynderwyn Hills in collaboration with Fulton Hogan. The project involved the construction of a custom 1m wide by 260mm deep Dish Drain, reinforced with 3 continuous rods and spanning nearly a kilometer. We completed 2 out of 5 pours during the night to stay on schedule and are proud to have played a key role in the reopening of State Highway 1.
RECENT PROJECT
Kerb and Channel
Slipform NZ had the opportunity to contribute to this road transport project in the Auckland Region, where we implemented a range of kerbing profiles across the job. This particular vertical kerb and channel design demonstrates our dedication to precision and delivering high-quality results.


RECENT PROJECT
2.5m Shared
Pathway
We recently completed a slipforming project in the southern Bay of Plenty, where we paved a 2.5m pathway over two days, right in front of a school. The benefits of slipforming this job included minimal disruption to both students and staff, as well as the ability to create smooth and consistent surfaces - important for the safety and durability of the pavement.
RECENT PROJECT
3m Shared
Pathway
Slipform NZ is proud to showcase our machine in action on this project, where we constructed an impressive 3-meter wide exposed aggregate, continuous footpath in Auckland. This particular project involved using a center-mounted mould on a 4.5 meter wide site, where our operator’s precision was essential in achieving minimal clearance while paving over mesh.


RECENT PROJECT
Subdivision 1.5m Pathway
Slipform NZ played a key role in the development of this subdivision in Gisborne, where we completed consecutive 200m+ days of slipforming 1.5m wide footpaths. A highlight of the project was crafting a custom 13mm round river stone exposed aggregate slipformed pathway - a first in New Zealand. The crew also completed over 1500sqm of decorative pram crossings, right-of-ways, and road centers. Slipform NZ is dedicated to fulfilling every concrete need, reducing the need for multiple contractors, and ensuring comprehensive project delivery.
RECENT PROJECT
Commercial
Carpark Kerb
Slipform NZ delivered precision-engineered kerbing for this commercial carpark, helping keep traffic moving smoothly while offering a tough, low-maintenance solution. Our advanced slipform technology allowed us to create clean, consistent lines, providing both functionality and aesthetics to enhance the overall design of the carpark.
